Dear Experts,
I have a scenario where we need to block partially consumed CDN's to be consumed in future. With standard SAP if a CDN is consumed partially/fully we cannot delete/cancel the CDN. I am exploring ways to find help with technical change so that I can block the partially consumed CDNS not to be considered in future.Business would be fine even if the unconsumed CDN's reflect as an open quantity in the report J3RFGTDUSAGE
This is for Russia and CDN needs to be assigned to the Billing document while creation. If CDN is not avialable for the quantity in the invoice ,It does not allow to save the document.(Just to explain the process)
Tcode wich we use to create CDN:J3RFGTDINT
Table to check the created CDN:J_3RFGTD
Table to check the used CDN: J_3RFGTDINV
Many thanks to Help
Regards,
Jeff