Dear All,
I have a empty drum scenario, which goes with finish material, finish material is stock able and valuated, but empty material is only stock able having no value.
System explode the BOM at sales order level. With main and sub material, sub material is a empty material.
But when I create sales order system give error message and "VPRS is missing, as the pricing procedure this condition type for the finish material.
Item category for LEIH material type system determine TANN, but I don't know why system is asking for VPRS.
Please provide the possible solution.
Regards,
Imran khan